In 2009, it started in a 400-square-pressure workshop. It didn't change, it didn't take on cross-species -- it was "Will you still be there" when overseas clients chose suppliers, not "What can you do?"
| Year | Node |
|---|---|
| 2009 | The 400 m2 workshop in Changan Town was set up as a pusher. |
| 2012 | From the molding tool workshop, from foundry to acceptable mold opening |
| 2015 | Received the first direct European customer via ISO 9001 |
| 2017 | Introduce CNC production line to make up for the milling capacity |
| 2019 | Move to current location 12,000 m2, via IATF 16949 |
| 2022 | Three additional coordinates of measuring room through ISO 13485. |
| 2024 | The five-axis production line was put into operation, and the number of exporting countries reached 34. |
| Area | Proportion | Major Industries |
|---|---|---|
| EU | 38 % | Automotive · Automation |
| North America | 27 % | Medical · Consumer Electronics |
| Southeast Asia | 18 % | Consumer electronics |
| Middle East | 9 % | Industrial & Construction Hardware |
| Other | 8 % | — |
| Total number of people | 180 |
| Engineering & Technology | 22 |
| Quality | 14 |
| Foreign Trade and Documentation | 9 |
| Available working languages | C/E/S |
There is no minimum threshold for cooperation, but there is a clear subparagraph — where you are — which determines what to do in the first step.
Send a direct STEP or DWG, 24 hours to offer an offer and make a manufacturing proposal. After confirmation, 5-8 days to sample.
Send a sample to the factory, and we'll map it for you to confirm.
When it comes to clean-up and budget areas, we look for a similar model from the catalogue, or we suggest that we switch to a standard package reduction.
Most of the long-term clients start with a sample order.
Send a drawing request for quote →