The procurement engineer's question was never "What are your models?" It's "What should I use for my work." So here, by industry, each piece lists the standards that the industry is carrying out, the materials that we keep, and the type of parts that are already running.
The second-tier supplier of the entire vehicle plant is the main provider, with most projects starting with the PPP level III document.
The most common card point: the client uses a map of the civilian parts to make the car code, thermal processing and plating requirements are not good. We'll point out at the quote stage.
| System Requirements | IATF 16949 |
| File Level | PPAP L3 |
| Standing Materials | SPCC · SUS304 · 6061-T6 |
| Typical tolerances | ±0.02 mm |
| Batch interval | 50,000 – 2 million/year |
The trade is about the end of the life and consistency of the molds — big, low unit prices and high return costs.
The most common card point: only the first price does not look at the life of the mold, and the second year's supplement is more expensive than the savings. Our model is designed at 5 million run-throughs.
| Mold life | ≥ 5 million times |
| Standing Materials | C5191 Phosphorus copper SUS301 Nickel plating steel |
| Minimum material thickness | 0.15 mm |
| Typical tolerances | ±0.03 mm |
| Batch interval | 100,000 – 5 million/year |
Surgery equipment structures, image equipment support, one-time equipment metal.
The most common card point: The material can be traced back to the chain. Each batch of stowage numbers, the material proved to be the same as the finished product, without batching.
| System Requirements | ISO 13485 |
| Standing Materials | 316L · 17-4PH · PEEK |
| Traceable | Furnace Grade |
| Packaging | Dust-free workshop |
| Batch interval | 500,000 – 50,000/year |
Transmitting lines and robots are integrated into a commercial straight-line orbit, connecting support frames, moving axes and custom fixes.
The most common card points are the dozens of spare parts for a project.
| Standing Materials | 6061-T6 . 45# Steel . SUS304 |
| Typical tolerances | ±0.01 mm |
| Proofing period | 5 – 8 days |
| Small Batch Minimum Order | 50 pcs |
| Batch interval | 500,000 – 20,000/year |
An explanation of the application scenario is attached, and the offer will be given to you together with the selection proposal.
Send a drawing request for quote →