The biggest cost of cross-border procurement is not a unit price, it is trust. So this page spreads the entire equipment, capacity, and quality-checking process – including what we can't do. Video labs are available at any time, and most customers will read it once before the first PO.
| Equipment | Quantity | Specifications/itinerary |
|---|---|---|
| Vertical machining center | 28 | 800 × 500 × 500 |
| Five-axis machining center | 6 | Ø500 Turntable |
| CNC lathe | 8 | Ø320 × 750 |
| High-speed punching machine | 12 | 25 – 110 t |
| Precision punching machine | 6 | 160 – 250 t |
| Wire cutting | 4 | ±0.003 mm |
| CMM | 3 | ±1.8 µm |
| Image Measuring Instrument | 5 | 2.5D |
| Plant area | 12,000 m² |
| Number of employees | 180 people |
| where engineer | 22 people |
| Stamping Monthly Capacity | 8Munits |
| CNC Monthly Capacity | 450Kunits |
| Proofing period | 5 – 8 days |
| Batch delivery date | 18 – 25 days |
| On-Time Delivery Rate | 98.6 % |
Aluminium anode oxidation and thermal processing is a long-term cooperative field, which provides quality and test reports -- but we do not pretend to do it ourselves.
It's not "we value quality," it's what documents are produced at every step, how long are they kept, if you want them.
A check of the furnace number and the material certificate, both hard and thick, for each batch. The record is three years.
Each new piece number, the first report after each remodel, is measured at three coordinates of full size, before the client's confirmation is made.
Check critical dimensions every 2 hours, SPC records Cpk. Over and above the control line automatic stop.
Sample AQL 0.65, with export inspection reports and packing photographs.
The engineer takes his cell phone to the workshop, and you're looking at it, including the running equipment and the lab.
Appointment for Video Factory Inspection →